In a previous post, I wrote about patent litigation between Canadian utility Hydro-Quebec (H-Q) and Massachusetts based lithium ion battery maker A123 Systems (A123), in which A123 lost its bid to have its declaratory judgment action litigated in its desired forum of Boston.
Tag: